#420 · Lift out, no other lift · Oriel Mansions
done Mon 19:01 · alarm 2009
Ledger row
policy v2
policy v2
- The call
- POST /buildings/32/notices
- Action, tier
- notify_residents, tier 1
- Decided by
- rules: After open_ticket_from_alarm: Emergency ticket 5669 opened from alarm 2009, vendor 98 dispatched.
- Controller
- Allowed: notify_residents is tier 1 (do it and tell); within budget (1 of 6 actions at building 32 this hour).authorityconditionscooldownbudget
- Definition
- lift_outage_single v1
- At stake
- 37 homes above ground floor without a lift
- Outcome
- Notice posted to the residents of building 32.
- Undo
- Withdraw the notice.
Undo
Restores the before-snapshot below and writes a new row.
Evidence
{
"alarm_id": 2009,
"amount_at_risk": null,
"asset_id": 968,
"building": "Oriel Mansions",
"building_id": 32,
"currency": null,
"floors": 6,
"has_ticket": false,
"homes_above_ground": 37,
"lifts": 1,
"lifts_in_planned_works": 0,
"manager_id": 4,
"minutes_out": 5,
"raised_at": "2026-11-02 18:56:12.21953",
"residents_notified": false,
"stake_note": "37 homes above ground floor without a lift",
"started_at": "2026-11-02T19:01:12.219530",
"ticket_id": null,
"working_lifts": 0
}Before and after
{
"after": {
"tenant_notices": [
{
"body": "The lift in your building is out of service. An engineer has been called as an emergency. If you need help with stairs, call the building manager and we will arrange it. We will post an update when it is running again.",
"building_id": 32,
"id": 215,
"kind": "building_notice",
"lease_id": null,
"sent_at": "2026-11-02T19:01:30",
"sent_by": "keys operator",
"stage": null,
"status": "sent"
}
]
},
"before": {},
"endpoint": "POST /buildings/32/notices",
"note": "Notice posted to the residents of building 32.",
"notified": {
"message_id": 84,
"to": [
"building manager"
]
},
"ok": true,
"rollback_fn_name": "undo_notify_residents"
}Arguments
{
"building_id": 32,
"text": "The lift in your building is out of service. An engineer has been called as an emergency. If you need help with stairs, call the building manager and we will arrange it. We will post an update when it is running again."
}